Tongda11 Gas Treatment Tower Exhaust Tower Waste Gas Exhaust Treatment with Electroplating Machine

Customization: Available
Clapboard: without Clapboard
Filter Number: Customized

Product Description

Basic Specifications

Model NO.td 11
Medium MaterialPP
EfficiencyF9
Filtration GradeMedium Filter
TypeCartridge Filter
Control SystemCustomized
OEM ServiceAccept
Material of TankPP, PVC
Thickness of Tank15 mm/ Customized
StyleGas Treatment System
ApplicationGas Treatment
ConditionNew

Product Description

Gas Treatment Tower Exhaust Tower Waste Gas Exhaust Treatment for Electroplating

Gas Treatment Tower

Equipment Introduction

  • Packed tower design for purifying exhaust gas, suitable for continuous and intermittent emissions.
  • Simple skills, convenient handling, operation, and repair without impacting workshop production.
  • Wide application range, capable of purifying various pollutants and dust-containing gases.
  • Tower body constructed from high-quality durable PP board material.
  • Filler made of high-efficiency, low-resistance multi-faceted hollow spheres to maximize removal of odors and harmful substances.

Exhaust Gas Treatment System Gallery

Exhaust System 1 Exhaust System 2

Working Principle

Under the action of the fan, exhaust gas enters the adsorption tower unit. After cooling, filtering dust, and oil mist, it passes through high-performance adsorbent solids. Organic waste gas molecules are attracted and attached to the adsorbent surface. The cleaned gas then passes through the chamber and is discharged through the outlet.

Working Principle Diagram

Exhaust System Suction Options

The exhaust system collects waste gas from plating tanks. Choose from three configuration options:

Option 1: Tank Suction

  • Advantage: Simple technology, low material usage, and most cost-effective. Suitable for long tanks (over 1.4m).
  • Disadvantage: Smaller absorption area.
Tank Suction

Option 2: Side Suction

  • Advantage: Standardized dimensions, medium pricing, and largest absorption area.
  • Disadvantage: Absorption areas are untargeted.
Side Suction

Option 3: Top Suction

  • Advantage: Highly targeted absorption area for maximum efficiency.
  • Disadvantage: Complex manufacturing process and higher price point.
Top Suction

Tower Structure & Materials

Constructed with circular tower bodies connected by flanges. Includes liquid storage tank, inlet section, spray layer, packing layer, swirling defogging layer, and outlet cone.

Tower Structure PP PVC Plate Material

Logistics and Quality Assurance

Shipping Certifications Global Clients

Frequently Asked Questions

Q1: Are you a trading company or a manufacturer? A: We are a professional manufacturer specializing in gas treatment equipment.
Q2: How long is the delivery time for the exhaust tower? A: Delivery time depends on the order quantity and specific customization requirements.
Q3: What are your standard terms of payment? A: For orders under 1000USD, 100% in advance. For orders over 1000USD, 30% T/T in advance, with the balance due before shipment.
Q4: Can the equipment be customized according to specific tank sizes? A: Yes, we provide OEM services and can customize the tower dimensions and tank thickness (standard 15mm) to meet your needs.
Q5: What materials are used for the tower body construction? A: We primarily use high-grade PP (Polypropylene) or PVC (Polyvinyl chloride) plates for maximum chemical resistance.
Q6: What kind of after-sales support do you provide? A: We offer online technical support and provide free spare parts as part of our after-sales service.

Related Products